Inderes’ Disclaimer can be found here. Detailed information about each share actively monitored by Inderes is available on the company-specific pages on Inderes’ website. © Inderes Oyj. All rights reserved.
Read transcripts of webcasts and audiocasts
Read transcripts of webcasts and audiocasts
Disclaimer: This is a machine-generated transcript and may contain inaccuracies.
Hello, everyone, and welcome to Endomines' third-quarter results webcast. Thanks for joining us today. My name is Andy Turpin and I am the Chief Communications Officer here at Endomines. And with me in the studio, we have our CEO, Kari Vyhtinen, and our CFO, Minna Karttunen.
Good afternoon.
Our agenda today is that first, we will share the main points from the third quarter and the first nine months of the year. Kari will also give you an exploration update. After that, Minna will go through the financials in more detail. And then Kari will come back to the stage with the strategy and our plans for the future for the rest of the year and for the upcoming years. And as always, at the end of the event, we will have a question and answer session where we will be answering your questions, so you can send your questions via chat. You can send your questions via chat during the presentations. And please remember to type your questions in English. And as a reminder, this webcast is recorded, and the recording will be available on our website later today. And now we are ready to start. So let's go. Go ahead.
Thank you, Andy. Good afternoon, everybody. I am extremely pleased to be here today to go through the financial and operational highlights of January to September 2026. This was a truly record-breaking period for Endomines. If you look at the financials, we had very strong financial figures. Our revenue has grown by 42% to 47 million. The EBITDA has grown by 45% to 18.5 million, and it is up approximately 40% of the revenue. And the net result has increased to 13.8 million. And it is close to 30% of the revenue. So very strong financial results, which have really turned the company around and allowed us to invest a lot for the future growth. Our operational cash flow was 17.1 million during January through September. So, we also had a very strong operational cash flow that we used for investing activities. There were other items and key developments during the nine months and third quarter. If we look at the third quarter, the UKKO. Our main exploration target just keeps delivering. We are getting excellent results every time we publish. We. Last time we identified two new gold zones in the north, and that expands the potential area around UKKO by 1.7 km. We also extended our Boliden partnership agreement, so we sell our concentrate to Boliden, and that was now extended until the end of 2032. The new agreement is better tailored for our needs, and we estimate that this will also have a positive effect on our net result in 2027, and the effect will be approximately 1.7 to 2.3 million. This comes from the fact that with the new agreement, we can optimize the grade and the recovery better. This allows us to optimize the process in a way that increases our profitability. Moving on to our sustainability initiatives. We started a pilot project to test a new, more sustainable mine waste deposition method known as dry stacking. It hasn't been used in Finland before, but it's used in other countries, and we see it as a very important element in our future plans to implement this method and phase out the flotation tailing areas that are common in the mining industry; meanwhile, the Southern Gold Line is advancing as planned. So our plan is to increase gold production to 70,000 to 100,000 oz around 2030. And this work has continued as we have planned before, and everything is moving ahead nicely. At the same time, we plan to start producing also tungsten and molybdenum. During the third quarter, we published tungsten and molybdenum results, which confirm the potential. And we have also been very active going forward in the development plans that we currently have ongoing. So we are building the foundations for future growth. And we really want to thank everyone, the whole Endomines team, for the great work done. If we go back to the basics. Endomines is a gold mining and exploration company. Our operations are located in eastern Finland. The production is in a place called Pampalo near Ilomantsi. And there, we have an underground mine, an open-pit mine, and a mill where we produce the flotation concentrate. Then 15 km north from Pampalo. We also have an underground mine. And this ore is treated in the Pampalo mill. We perform exploration in two locations, Northern and Southern Gold Line. There we have a deposit called Kartitsa and then the Northern Gold Line and the Southern Gold Line. We are permitting the Southern Gold Line to be in production around 2030. And there we also have tungsten and molybdenum deposits. So when we increase our production to 70,000 to 100,000 oz level, we will also start tungsten and molybdenum production at the same time. The Karelian Gold Line is an Archean greenstone belt, so it is very prospective for gold mining and exploration. And we hold the rights for the key areas of the belt. So, basically, the whole greenstone belt is controlled by Endomines. Our strong financial figures come from two factors: production has been increasing and the gold market has been strong. If you look at our annual production on the right side, from 2022 to 2025, we have almost doubled our production. Our aim is always each year that we grow the production. And this year, after nine months, the production has grown by 5.5%, and we are expecting a strong fourth quarter. We have taken many actions to ensure that the fourth quarter will be strong. Our guidance is that production will grow by 10 to 20% during 2026, and we expect that the Q4 will ensure that this will happen. What we did in Q3, we improved mine planning a lot. We increased the equipment availability. We also implemented a five-shift system for the mill. So now we are operating 24/7. And we prepared a lot of new production areas and access ways for the mine, which we need for during Q4, but also 2027. And we expect this to have a positive effect on the Q4 production so that we have a higher volume during the Q4, and this will ensure the growth for 2026. The gold market is very interesting at the moment. There has been a lot of volatility now after the midterm elections, it is only the second day, but there have been strong movements in the gold market. And that is mainly caused by the expectations of lower yields in the US on a longer term. How do we see it? We see that there has been a lot of volatility. However, the basic fundamentals. They support the gold price in the future. There is geopolitical and economic uncertainty. Central banks are also a key factor. They are buying a lot of gold, especially China. Countries are decreasing their dependency on the US dollar, and the capital that used to flow into the US dollar is now moving into gold. And there are very high amounts of debt and concerns regarding how this debt can be financed in the future, the printing of money, and so on. So, the market remains strong for gold. The market is strong for gold. And the forecast for next year, if we look at the forecast from different banks and financial institutes, our estimation has been that the consensus is somewhere between 4,600 and 4,700, approximately 4,650 USD per ounce. So we expect the gold market to stay strong. Sustainability. We report the KPIs every six months. So in this slide, we have the KPI situation after the end of June. But our targets are fossil-free gold production by 2035, and we are heavily focused on water management. The water is the most important. We really want to take care of the water and the lakes. It is a priority. Finland is a beautiful country and the lakes are absolutely precious. So we don't want to do any harm to the lakes. And our target always is that the discharge waters are so clean that they do not weaken the surrounding waterways, ecosystems, or biodiversity. The main thing is that we consider nature values throughout the mine life cycle. So not just what happens today, but what happens during the whole life cycle of the mine. That is the key to success in every company. We want to ensure our people are safe, that there are no accidents, and that they enjoy working for the company. Lost time injury frequency. Lost time. Lost-time incident rate was 9.7. At the end of June. And this year, we also received this recognition. We also received Finland's most inspiring workplace recognition as employee satisfaction remained high. I am very happy about the local community. We spend a lot of time explaining what we do and getting feedback from local people. Just last week we had two information sessions near Ilomantsi, and we had a good discussion with the local people, focusing on governance to ensure responsible and transparent operations. That is always key to ethical operations. Exploration highlights. We started when the strategy was changed in 2022. We started the exploration activities in 2023 and it has been very successful. The resources have more than tripled, so from less than 200,000 ounces. Now we are at 620,000 ounces. We update the resources once a year. So the next update will be on March 27th. If we look at the history of what we drilled in the past three years, we drilled 52,500 meters in total. You get the resource growth. And this year we are drilling a record campaign of 50,000 meters. In one year. It is almost the same as in the previous three years combined, as of the end of September. The progress was such that we had already drilled 42,000 meters. There are a lot of results still at the laboratory, so we haven't published as much, likely closer to 30,000 meters. So there are a lot more results to come in the near future. Exploration is focused on two locations: the Northern Gold Line and the Southern Gold Line. Regarding the Southern Gold Line. We are targeting to be in production around 2030. So a lot of the activities now focus on the Southern Gold Line and especially this deposit that we discovered last year. And if we go to the UKKO, it's a world-class gold discovery, and it's a BIF-hosted gold deposit of the banded iron formation type. It means that the gold is associated with iron. And when you look at maps like this slide, there is an electromagnetic map of this area. And you can see in these drone measurements that this iron formation is absolutely huge, covering an approximately ten-kilometer potential area. So this is where our drilling activities are focusing on. And as I mentioned, this was only discovered in April 2025. So it is only one and a half years. It is unbelievable that we have achieved so much in one and a half years. We will publish the first results on March 27th. So March 27th will be the time when we publish the first gold resource for UKKO. Then we tried to put it in one slide. This is. It is a little bit difficult to describe the whole UKKO area because it is a very wide, ten-kilometer-long zone. And just to describe a little bit what has happened and what are the plans for the future? And if we start from the north. This is the area that we published in October, a release showing our first drill hole in this area returned over 30m of over three grams per tonne of gold. So, very significant high-grade intersection, a world-class intersection in this area, and completely new, 1.7 km from the main deposit. And if we move towards the south, there is the main deposit, which is approximately 650m long. And here we have done most of the drilling, and there are a lot of good drilling results. Wide intersections with 2 to 6g per tonne of gold. So it is very high grade. And what is typical here? There have been intersections like 50m at 2g per tonne, 20m at 4g per tonne and so on. They are wide intersections and a very promising area. And it is still open to the north and towards depth. Then a little bit south from there, we have a gold zone, which is approximately 200m long. We also published results regarding this zone earlier this year. It is a little bit lower grade, but anyway, important; 200m is a reasonable distance. And then in the south, we have done only a few drill holes. For example, there are areas where we have only completed two drill holes, yet we have discovered gold in three different locations. These are the locations that we are now drilling during the late autumn and early winter. And then also in Q1 2027. We will drill in those areas just to see what is there. So that's interesting. The main message here is that the area is absolutely huge. In most cases when we have tested an area, we have found gold, as the areas were defined by electromagnetic measurements that indicated high potential for gold deposits. And then we have drilled and usually there has been gold. So it is very promising on the eastern side. There is also a similar formation where gold has been found in the outcrop. However, we will drill this in 2030 or 2032. So not in the next 2 or 3 years as we have so much work to be done on the western side. So we will leave this for later. This is a task for a little bit later. And in the east, we did some drill holes, and we actually did not hit gold. So it requires a lot more work before we know where to target the drilling. We will give it a few years, maybe do some EM measurements or something like that. Next year in this area we plan to drill 30,000 to 40,000 meters. It is a significant amount and it will be focused on exploration. So looking for new areas. But then also at the main deposit. We will drill to upgrade the resource from the inferred category to the indicated category. That is the goal so that we can go ahead with the pre-feasibility study later. Our first quarter results will be published on March 27th. Tungsten and molybdenum are present in the Southern Gold Line. Tungsten is very important and used in the defense industry. It is one of the critical minerals in the European Union. There are significant amounts of tungsten and also molybdenum in the Southern Gold Line. And the latest drilling results we published confirmed the potential. We also conducted some sorting tests and achieved a grade increase of 3.1 times. So the idea is that we mine low-grade ore and send it to sorting. Increase the grade. Then it goes to processing. Processing. And that is the idea. That is the idea. That is the idea we are pursuing this year. We also received 1.5 million in funding to advance this project. And then this year, we have also signed a letter of intent with Wolfram Bergbau und Hütten AG, which is an Austrian company, part of the Sandvik Group, and that is to have a technical cooperation. The tungsten price has really been strong. It has come down a little bit, but it is still on a very, very strong level. And when we drilled this in Kuittila, which is in the Southern Gold Line, they are just next to the gold deposit. So it is outside the area where there is gold. So they are sort of the wall rock of the gold deposit. We have drilled approximately 14,000 meters. We published some of the results. The rest will be published in December this year or January next year. So there are more results to come. And those results will focus on tungsten and molybdenum. Our goal now is to increase the resource and enhance our knowledge as we permit this area for production. We need to identify the specific areas where we can establish production facilities and where the ore we will be mining is located. So a lot of activities occurred during Q3 2026. And now I pass on to Minna.
All right. Thank you, Kari, and good afternoon everybody. On my behalf. Here we have a revenue graph. I would like to mention first before I start that even though the Q3 numbers look slightly weaker, I think we have to focus on the big picture and look at the quite impressive numbers we have achieved during the January-September period. So year-to-date revenue is 47 million, which is a growth of 42% year-on-year, and gold production increased 5.5% year-on-year, followed by the quarterly numbers. So revenue in Q3 was €12.3 million. That is 7% up compared to the Q3 a year earlier. That is comprised of an average gold price increase of 23.4% and a slight decline in production volume of 3.9%, and then revenue compared to the previous quarter declined 24%. And that was a combination of both a decline in the gold price as well as in production, but overall, impressive growth numbers for the January-September time frame. And I would like to mention the other operating income we had in Q3. That was around 300,000 euros. This consists of the change in the fair value of the contingent sales price receivable. So we sold the Trixie gold deposit earlier this year in the US. For the second milestone payment, we had the option to receive the payment either in cash or in shares. And this time we opted for the share payment. So we did receive shares in a company called ELK Range Mining, which is now listed on the ASX in Australia, and the IPO took place on the 10th of August. And that is where the other operating income comes from. Year-to-date. EBITDA was €18.5 million. 45% growth year on year in euro terms, and it represents a 39.3% margin. So there's a slight increase in the margin as well. Q3 EBITDA was €4.2 million, a margin of 34%, and the Pampalo production segment EBITDA was €5.3 million, with a margin of 43.3%. Operating expenses. Here, I do not have the number, but total operating expenses amounted to €8.5 million in Q3, and of that, €5.1 million was paid for materials, goods, and services. The largest increase in that area was the maintenance and operating expenses of mining machines, and that includes rental costs of new machinery. We have invested somewhat in new machinery, and that is on its part. Also increasing the cost base. And then there was more maintenance work done during the summer holiday period. More than normally. And then employee expenses increased because we have more people working for us now. Looking at the September numbers, we have 24 more people working for us than we had at the same time last year. And the other operating expenses were €1.7 million, most of which comes, or the biggest change of which comes, from the mining mineral tax, which in Q3 was €400,000. And then we had royalties starting to run actually in Q2, and the Q2 and Q3 royalties were both booked. Now in Q3. So, €0.2 million, or 200,000, altogether, and approximately half of that actually pertains to Q2. So it is kind of a one-off for Q3. And what I wanted to mention here is that I don't have a slide on EBIT, but I would like to touch upon depreciation. If some of you have looked more in detail at the numbers already, you will see our depreciation amount was actually quite a bit smaller in Q3 than in earlier periods. And that is because in August there was a change in the estimated life of the mines. And that cumulative difference in the amount of depreciation for the entire January to September period was recorded for the third quarter, which was 0.8 million euros altogether. So Pampalo and Hosko are live. The estimated life of the mines now reaches until 2035. Cash cost year to date was €1,657. It is 24% up year-on-year, and in Q3, the cash cost was €1,839 per ounce, which is an increase of 26% year-on-year. It is a significant increase. It is particularly affected by the use of lower-grade ore in production. And I know we don't publish these numbers in our reporting, but I wanted to open up this a little bit to accentuate the effect. Accentuate the magnitude of this lower grade ore effect, because if we have a lower grade ore, we need to increase the tonnage. And then, of course, the processing costs will increase. So, to give you an idea of this, both year-to-date and quarterly, the tonnage of mill feed has increased by about one-third. So it is about 30% up year-on-year. And if we look at the unit cost per tonne, the increase is about 4%. So that puts this increase into perspective, in my opinion. We have also prepared for the next year. So there are additional costs there as I mentioned. We have opened new production areas and built the necessary access ways, along with the maintenance and operating costs of the mining machinery. As already mentioned, this has had an effect on the cash cost in Q3. The net result year-to-date is 13.8 million, with nearly a 30% margin. And just to put this number in perspective, in comparison, our full-year 2025 net result was €7.3 million for the full year leading up to Q3. Net result was €3.4 million, representing a 27.5% margin. We had net financial expenses of 0.7 million. Interest expense on interest-bearing loans was €0.3 million. That has halved from the previous year. So our financing cost has really gone down. And then there is this new item, this valuation loss of 300,000. And this is what I just mentioned; we opted for a payment in shares in ELK Range Mining. And we are a significant shareholder there. Now we hold over 12 million shares. At the time of the IPO, we were the largest shareholder with a 9.95% shareholding. And going forward, changes in the share price will be recorded through our financial expenses or our gains. As the case may be. The IPO price in August was 0.20 Australian dollars. And at the end of September, it was 0.16 Australian dollars. The minimum holding period for these shares is one year. So at least for the next 12 months, we will have this item in our financial expenses. The group EPS basic for the Q3 was $0.10, and for the year to date it is $0.40. Balance sheet. Strong cash flow. On a good level, our total balance sheet nearly reached €110 million at the end of September. Cash is still on a similar level as at the year-end, at 3.8 million. Interest-bearing debt is steadily going down to 11.8 million, and interest-bearing net debt is 8 million. Net gearing has been around 10%. The equity ratio was nearly 68%. So really, really strong. When it comes to the debt estimate on the right-hand side, where you can see the division between long-term and short-term debt, the short-term debt is 6.3 million, of which 5.8 million is actually the remaining convertibles we have. So they are very much in the money, so to speak. So paying back that short-term debt will not have a cash effect on the company. Cash flow was 5.8 million year-to-date, with 17.1 million in net operating cash flow, followed by investing cash flows. 6.7 million and 16.7 million on a year-to-date basis. Investments have been made in both the Pampalo mine and exploration in the Southern Gold Line, focusing on both gold and tungsten, especially in the third quarter. Thank you.
Thank you. Minna. Strategy. So we have five points in our strategy: the production, where we grow the production each year. That is the engine of our growth. We invest the money into exploration. That is the biggest item. So that we can grow the gold resource, which enables us to grow the production to completely new levels, a lot higher levels, and then the critical minerals that are part of our strategy. So we focus on tungsten, but we also focus on molybdenum and financial stability. So we want to have a stable situation on the financial side. We don't want to continuously raise money. And then sustainability, that is the backbone of the business. We want to do things in the right way. And our long-term targets are 1.5 to 2.0 million ounces of gold resource by the end of 2030. Currently 620,000, so approximately three times higher. Annual gold production is targeted at 70,000 to 100,000 ounces of gold around 2030. And take the tungsten and molybdenum into production at the same time. So this is 4 to 5 times higher gold production and therefore self-funded gold production by 2035. And how we get there is by growing the resource, just as we have successfully done over the last three years. And now we have been speeding up in 2026. So we have really upgraded our drilling volume. Over the past three years, we have estimated that when we do 10,000 meters of drilling, we get approximately 100,000 ounces of resource growth. So to get from 620,000 to 1.5 to 2,000,000 oz, we have estimated that we need to drill 120,000 m of exploration drilling. And this year, as I mentioned, it is a record volume. We are the largest operator in Finland. We are drilling 50,000m of exploration drilling, and we expect next year to also be a high-volume year. And that resource growth enables us to grow the production. So, currently, we have a capacity at the Pampalo mill of approximately 25,000 ounces. The output is growing steadily. The bottleneck has been the mine. Increasing the volume in an underground mine takes time. So we grow it steadily until we get to 25,000 ounces. And then the big jump will come when the Southern Gold Line comes into production. And that we estimate to be around 2030. And then after that, there is the Southern Gold Line phase two. There is the Northern Gold Line. There are other deposits. So the goal is not to stay in this 70,000 to 100,000 ounce level. We aim for much higher levels in the long term with the Southern Gold Line development plan. We started the permitting in January 2024, so we have now done already close to one year. We have permitted four mines in this Karelian Gold Line. So this is now the fifth. So we have a good idea of how it needs to be done. And we have launched the Environmental Impact Assessment Program. Next year we will launch the report and apply for the permit. And we estimate now the PFS will be completed in Q3 2028. So a little bit later than what we have estimated previously. And this is due to the fact that we need to drill the resource to indicate the category, which we will do next year and early in 2028. Early 2028. So then after that, financing negotiations will be completed, an investment decision will be made, and then we will go to production as quickly as we can. And an outlook for 2026. So we expect a strong finish for the year. The guidance for the production is 10 to 20% growth. There is no change to that. And Q4 is supported by the actions that we took during the July to September period. Resources. We are continuing and now finishing the largest drilling campaign, and we will be publishing results later this year and also early next year. And then we continue the development of the Southern Gold Line expansion and also the tungsten project and the design. Is the feasibility study going to be done in the Southern Gold Line? So the next growth phase is in a lot stronger position today than where it was one year ago. And if you look a little bit at our priorities for 2027. We want to deliver production growth. That is key: we grow the production as our other activities are growing. So this cash flow that we get from production is the engine for how we grow the business in other sectors. And then we want to expand the resource base. The resource update will be done in Q1 2027. The first resource update will be published in March 2027. And then we will do this infill drilling to transfer the resources from inferred category to indicated category, which is needed for the pre-feasibility study, and we will continue also the exploration activities at UKKO, especially also. Also some other areas. And then the Southern Gold Line project. We will launch the Environmental Impact Assessment report. We will apply for the permit, and the scoping study will be completed. The pre-feasibility study will be ongoing. So it will be a busy year ahead. Exciting times are ahead. Our strategy remains unchanged, and execution is progressing according to the plan. So, I am really happy to report the progress after nine months. Thank you. Now we are ready for questions and answers.
Yes. Thank you. This is Kari Vyhtinen again. Yes, it is time to move on to the Questions and Answers session. We have had quite many questions again. So let's get started. The first question is about the Boliden partnership. Can you elaborate on how the Boliden partnership affects the net profit? What is the Boliden agreement effect on cash cost?
This is actually how it works; the details are confidential, so we cannot share the exact details. But what has happened before is that because we are producing a flotation concentrate, and in the gold production, there are two big things. There is the gold recovery. So how much you recover from the ore and then the grade of the concentrate, and the previous agreement was not well-suited for the Pampalo process. So we needed to optimize our product to match with the Boliden requirements. And we experienced some losses in the production process. So now it's better tailored for the production, and we can really optimize the grade and recovery. And we expect that to have a significant effect on the profitability. So yes, we are very pleased about that.
Okay. Let's stay with the cash cost. Cash costs increased in this quarter. How should we think about cash costs in the next quarter and going forward: increasing or decreasing?
Is it me or you? Well, I.
Well, I think last time I said something. Yeah. Well, you can continue then. I think last time I said something it was a similar question, and I said that it still might go a little bit up and then it should go to a more sustainable level. So now we saw the going up part and it should go down in Q4. And then also, going forward to 2027, I would think the year-to-date level where we are at the moment is kind of a level to be expected, at least for the next 6 to 9 months. Yes. Did you have something to add?
No, I think absolutely. That has been the view. So. Yes, exactly.
Next question is about investment cash flow. Investment cash flow was -€6.7 million. What was the split between Pampalo mine and the exploration drilling in the Southern Gold Line?
It was slightly more on Pampalo, and this was especially because of the investments in the equipment. So.
Okay, let's move on to the tungsten. Tungsten. You said that you will continue to develop the tungsten and molybdenum project without the status of a strategic project in the European Union, at least for the time being. What do you mean by the time being?
Yes, that is a good question. It is possible that we apply again because we received a negative decision. And that was mainly due to the fact that some of our plans were. They were quite early-stage plans. We launched the application on January 26, and since then we have done a lot of drilling and a lot of updates on the plans. And so it is possible that we apply again, but we will go forward anyway. The status is not critical for us. But we see that it would be important to raise awareness that this is important for Finland. This is important for the European Union. We would like the product to stay in the European Union. That has been our goal. And therefore we might apply. Again.
Let's stay with this topic. Can you give an update on Endomines' cooperation with Wolfram Bergbau und Hütten AG? And are you looking for other partners for future investments and production?
The partnership is. The main goal has been to get help with the product so that we produce a sellable product, as there are certain quality specifications that need to be met, and we have received help regarding what kind of process equipment we should use and similar matters. It is a non-binding letter of intent so we can look for other partners. I think when the time goes a little bit further, when we are in late 2027 or 2028, I think it is realistic to estimate that we will discuss this with a wider group of partners. As there is a lot of interest in tungsten, there are a lot of opportunities. What we could do with the tungsten, we also see it as a potential financing element. It is a side product that is not part of our core business. So it could be used for financing, but time will tell. Now the focus is just to increase the resource and do the plans so that we know exactly how much it will cost and how much money it will make. And then we can go further into the partnerships.
Mm-hmm. Are you planning to release Tungsten and/or Molybdenum resource estimates in 2027?
We could. Most likely, yes. Most likely yes. Yes.
Next question is about Pampalo production. Are you happy with the Pampalo underground mine production at the moment?
Well, we would always like to produce more. It is. Of course, that is the key. We want to grow the business. We want to grow the business as quickly as we can. Most of our production comes from the underground mine, but there we are, of course, reliant on the underground mine. It is something where to produce more, you need to make the development work. You need to have the tunnels to access the areas with gold and so on. So it's not a fast process, and we look at this on an annual basis. For us, one quarter does not matter because we have an annual target and that is what we aim to achieve. And some quarters will be higher, some quarters will be lower. Everything has gone according to the plan. That is the main thing. And we have ambitious plans. They are not easy to achieve. So I'm pleased.
Then we have a question about the recovery rate. Can you comment on your current recovery rate. What kind of levels? Levels you have.
We don't usually comment on the recoveries in production. That has been a conscious choice in a way, because otherwise it would become a regular part of the standard reporting package. And I think it would get quite complicated with different ore types and different grades and recoveries. So we haven't published that.
Then we have actually the last one, and it is about dividends. Is it possible that Endomines could start paying dividends based on this year's results?
Well, we are a growth company and our focus is to grow the company as quickly as we can. And what that means is that the money that we make, we invest into the growth. So we invest in exploration and invest in production growth. So we see it as very unlikely that we would pay a dividend this year from this year's results. Of course, in the future everything is possible. And especially after the significant jump in the size of the company, when the Southern Gold Line comes to production. Then after that, we see the company as a company that pays regular dividends. That is the view today, but we understand everything can change. But that is the vision we have today.
Thanks for the excellent questions, and thanks again for joining us for this webcast recording. And the presentation material will be available on our website later today. Thank you, thank you. We wish you a great day.
Have a good day. Thanks. Goodbye.