Hi all, and welcome to this presentation of the Q2 2024 report. It is also a developer of renewable energy projects within solar and energy storage. Our activities are based on close to 35 years of industry experience, encompassing more than 140 skilled and committed employees overseeing our operations in seven countries in Europe and North America. We have a portfolio of about 250 projects with a potential of 28 gigawatts. Our business model is to develop and sell renewable energy projects to utilities and financial investors. We construct the projects on behalf of the customers. We're often also entrusted by our customers to perform long-term technical and commercial asset management services for their operating assets. Currently, we also have 967 megawatts under asset management. Our portfolio was more or less stable during Q2 and amounted to 28.4 gigawatts. Roughly half of the projects are located in Sweden, and 20% each in Finland and the U.S. The mix between the techniques and technologies comprises approximately 40% offshore wind, 30% onshore wind, and the remainder includes solar PV, battery storage projects. And we also have a lot of combinations where these different technologies are used at the same site. During the second quarter, we had a strong focus on the ongoing construction and sales processes for the US battery project farm and for the three Swedish onshore projects for close-up at DalaVind, and completion and handover of the Skurup project is also high on our priority list. There were no new transactions closed during the quarter, and revenue recognition has therefore not started for the projects that are under construction. And, uh, not yet sold. This is the main reason why we have a negative operating result for the quarter. For the second quarter, we have net sales of 54 million SEK. Uh, we have a net loss of $50,000,006. The earnings per share was a loss of $1.99, which is significant, and we have an equity-to-assets ratio of 44%. As you can see, there is a significant difference in both net sales and net profit compared to the second quarter of last year. The reason for this is that the second quarter of 2023 was the best quarter so far in our company's history, and included both the sale of 125-megawatt wind power projects under construction in Sweden and a large milestone payment from the customer regarding the American Centennial Flats project. Catharina will elaborate more on this later. To give a deeper understanding of the fluctuations. Nonetheless, if it loses, earnings will continue to vary between quarters and tiers, mainly depending on completed sales processes and revenue recognition for ongoing construction in some projects. So therefore, we often say that it's quite relevant to also look at the rolling 12 months, where we have a bit of $203 million and a net profit of $83 million. Near-term revenues, profits, and cash flow will very much be determined by quite a few projects and events. Is the sale of 88 megawatts of wind projects in Sweden? The sales of the home-based battery energy storage project, the completion of the Stockholm project, and upcoming milestone payments from the Centennial Flat project. I would like to do a deep dive into some of these projects to give a status update.
Uh.
We've started the construction and sales process for the Goes Up and the DalaVind projects in Sweden. Deforestation and the construction of roads have started. We entered into a turbine supply agreement with Vestas earlier this spring. All projects are located in price area three in Sweden. Higher electricity prices and forecasts are noted, especially when compared to projects further up north. In an attractive price area, the turbines in full close are the highest turbines constructed by us so far, with a tip height of 247m. We expect to complete the sales process during Q4. The next project to highlight is the battery project in San Diego. It's a 400-megawatt project with a four-hour duration. It comes with a long-term PPA. Construction is ongoing, and the delivery of the battery systems will start in September, as of the end of Q2. The investment in this project was quite heavy for us. We have entered into project finance with an American bank, which we signed and closed in August. The sales process has advanced over the summer. The sale of the project is expected to take place during the coming months. A commercial operation is planned to commence at the beginning of 2025. The project is a 260 megawatt project, north of the Stonewall Inn in Sweden. We are 51% owners of the project. The project is not yet completed due to technical problems that the turbine supplier has encountered, but all turbines have started producing electricity during the spring. Currently, 37 out of the 42 turbines have passed the test run. We reiterate that our assessment is that the delay will not have any significant impact on Eolus's margin from the project since we are covered by late delivery, liquidated damages from the supplier. Additionally, we receive the operating net income from the electricity production of the projects. During the quarter, we submitted a permit application for an offshore wind project in Sweden called Skid Plattner. It's located in the Baltic Sea. No, uh, north of the sand dune. It's a large, large project with a potential electricity production of up to 12 terawatt hours per year. Uh, so.
Uh.
Roughly comparable with the largest nuclear reactor in Sweden. I also want to give you an update on what you can expect to see from our prioritized projects in the pipeline and our ongoing activities. And I start with the wind project in Latvia. It's a project of up to 158 megawatts. When constructed, it will be the largest wind project in Latvia. All major permits have been obtained and the grid connection secured. Construction is expected to start in early 2025. With a commercial operation planned for 2027. We expect to initiate the sales process in the near future. Next, the American battery project in Nevada is a 126-megawatt project where we have received all main permits. We have secured the grid interconnection agreement with really attractive terms and conditions. We have procured the long lead-time components, such as transformers and high-voltage breakers for the project. We're now conducting the final design and applying for the construction permits. We expect to run the sales process during 2025. Which would give us the possibility to have the project in operation already during 2026.
Turning to Finland, we have the Moto Machi 2 project.
This is the most advanced project from the portfolio that we acquired last year. I'm very pleased to see this project progressing, maturing, and having the potential to also include some solar PV parts to utilize the grid connection and make the combined facility more valuable from a system perspective. The land use plan was approved and gained legal force in July. We'll now complete the wind measurements, apply for the construction permits, and aim to enter into a grid connection agreement, which could give us an opportunity to reach commercial operation during 2027. Also in Sweden, in the attractive price area three, is a partnership with regional partner DalaVind. Eolus owns 49% of the project. That in total is 238MW. Here we also expect to start construction during 2025 and run the sales process in 2025. There are a couple of local partners interested in investing in at least parts of the project, and we plan for commercial operation during 2027. Finally, added to the list is another Swedish project, the Ulm, located in the municipality of Kristinehamn, where we have all projects now in place. We intend to run the sales process during the first half of 2025 and then start construction. And thereby hand over to Catalina.
Hi, everyone. And thanks. Then we turn to the financial slides for the second quarter of 2024, and sales were 54 million. And that is significantly lower compared to the second quarter last year when we had net sales of about 1.7 billion set for this quarter. Revenue recognition from the software firm, based on the degree of completion for the second quarter, is included in the net sales, with 3% in total still having a percentage of completion of 85%. The delays in completion and handover are due to the previously communicated technical problem with the turbine supplier. Our assumptions are still that the delay will not have any significant negative effects on the average margin. This is because the delay penalties and net operating income from electricity production are expected to compensate for the delay. Additionally, the remaining 15% of completion is expected to be accounted for during 2024. Revenue and profit are significantly lower this quarter compared to the same quarter last year. Our performance was primarily due to the substantial positive contribution from the sale of Eolus projects during the second quarter last year, which was also the best quarter ever in Eolus's history. Since these three projects were under construction, both revenue from the sale of shares in the project companies and revenue recognition from the construction contributed to the results in Q2 2023. During the second quarter last year, we also received a significant milestone payment related to the U.S. Solar and battery storage products. Centennial Flats, which also made a significant contribution to the profit in Q2 last year. Overall, one of the reasons A+ net sales fluctuate between quarters and sometimes also between years, is the timing of sale transactions. Another factor is the degree of completion of the project, where we have started construction before they are sold. When the product companies are sold, the shares in the product companies are transferred to the customer, which has a significant impact on the revenues. At the closing of this transaction, the requirements are fulfilled for revenue recognition according to the percentage of completion method. At that point, all incurred costs that Alice has deployed will be reimbursed and reported as net sales. However, the margin will not be affected by the reimbursement of costs, only sales, price, and revenue recognition from the construction management agreement, if applicable to the project, will affect the total margin. As for now, as in the US and the Swedish onshore wind farms, projects are built up and are under construction and not yet sold. It will have a significant impact on net sales and profit. Once they are sold and the project companies are handed over to the customer, then the requirements for revenue recognition according to the percentage of completion method are fulfilled and the revenue recognition based on the degree of completion will start. As mentioned, Alice will also be reimbursed for all incurred costs and will report them as net sales. And if we turn to expenses for the group, they are 6 million SEK higher compared to the same period last year, with the increase aligning with the business plan for expansion set for 2022 and 2024. However, we will see, for the remainder of 2024, lower activity compared to 2023 when it comes to recruitment. We had a negative operating profit for Q2 of -26 million, compared to a positive amount of 517 million in the same quarter last year. The main reason for the negative operating profit is the low degree of completion. And now that we know sales of products have taken place, net from financial items for the quarter was -19 million SEK, compared to -14 million SEK last year. Interest costs are higher for the quarter due to financing of ongoing constructions. We had a net loss for the period of 15 million SEK, compared to a net profit of 242 million SEK in the same quarter of 2023. The difference in net profit compared to the same quarter last year is primarily attributed to the sale of products last year. Just mentioned, if we go to the balance sheet for Eolus, we had total fixed assets amounting to 313 million SEK, and that amount has increased compared to the second quarter last year. And that's due to land lease agreements in the US, battery storage product form and future payments according to conditions in that agreement and when the home is sold and handed over. This item will be reduced by approximately $200 million. We have a high number, uh, for work in progress and projects under development. It was 1,557,000,006. And for advanced payments to suppliers, almost 760 million SEK, and approximately 1.1 billion of these is preferable to investments in ongoing construction in the US. The Swedish onshore wind farms will also be operational. However, in Sweden, as the products are not sold, the constructions are on our own books, impacting both balance sheet items and cash flow until the sale process is completed. Per informed, we have signed a separate project financing with a US bank for the construction of a home, and the project will now be fully financed until commissioning. Also, other investments in the product portfolio during the quarter have contributed to increased work in progress compared to the second quarter of last year. We had cash of 526 million SEK at the end of June this year, compared to 1.3 billion in June 2023. The lower cash amount is due to financing of the ongoing constructions. Also, investments in the product portfolio and financing of the running business. We had total assets of 3 billion and almost 400 million SEK, and that's the highest number so far in history. We had total equity of 1,493,000,006, of which 73 million is related to minority stakeholders. Also, interest-bearing liabilities have increased to nearly 1,200,000,000 compared to less than 500 million SEK last year. The previously mentioned lease agreement for PWM is included in the long-term liabilities with approximately $200 million. And once again, when the product is sold, the liabilities referring to the lease agreement will be removed, and the overall increase in interest-bearing liabilities is due to loans to finance ongoing constructions. If we have a look at the key figures, we have divided net sales and operating profit into product development and asset management. To start with, the net sales for asset management is 8 million, with an operating profit of 1 million SEK, and the remaining net sales is referring to product development with 47 million and an operating loss of 27 million SEK. We had earnings per share for this quarter of -1.996, and on a 12-month rolling basis, earnings per share is 3.35. The cash flow from operating activities during the quarter was -517 million, as compared to a positive 860 million the same period last year. Again, the main reason for the negative cash flow from operating activities compared to the second quarter last year, is the ongoing constructions and investments in the portfolio. Equity per share was about 57 SEK compared to 56 SEK in June last year, and we had a net debt of 417 million SEK due to capital tied up in projects. In this quarter, net debt and net cash are defined as current and non-current interest-bearing liabilities to credit institutions, less cash. For previous periods, The definition also included liabilities regarding lease agreements. This means that liabilities regarding future lease payments have been excluded from the calculation, and we think the adjusted definition is a better way of measuring the debt. Also, the previous period has been restated. So the net debt to net cash number is comparable during Q2. We also paid out a dividend to the shareholders. The amount was 56 million, which is 50% higher than what we paid out last year to shareholders. The number of full-time employees at the end of the quarter was 146 compared to 104 the year before. The order backlog is about 660 million SEK, which is lower compared to June last year. We expect to increase the order backlog when the ongoing selling processes are completed. Also, the structure of the transaction will impact the number of the backlog. Equity to asset ratio is 44%. And still having a solid platform. However, the tied-up capital in ongoing construction is lowering the equity to asset ratio. And the return on equity after tax is 6% for a 12 month rolling period. And that's the period from July 1, 2023, to the end of June 2024. Also worth mentioning, the net profit for the rolling 12 months is 83 million SEK. Then we had the last slide mentioning the projects under construction. In total, 456 megawatts were under construction at the end of June, with a degree of completion of 3% during Q2 and in total 85%. The remaining degree of completion will be accounted for during 2024, and the rest of the ongoing constructions are not fulfilling the requirements for the percentage of completion method, as the projects have not been sold yet and revenue recognition will start for those projects when agreements with customers are signed and predefined construction milestones are achieved. Then I'm handing back to Pat again.
Thanks, Kathleen. So, to summarize, there is a strong focus on the sales and construction of the US battery project and the Swedish wind projects for growth and profitability. We also signed a separate project finance agreement amounting to $175 million for the project in August. No transactions were closed during the quarter, which of course has a huge impact on the results for the quarter. Revenue recognition for the global and dollar projects will start as soon as the projects are sold. We have several mature projects in Sweden, Latvia, Finland, and the US approaching ready-to-build status. The sales process is estimated to be closed in 2025 for at least 3 to 5 of these projects. We have appointed Mr. Christer Baden Hansen as the new Chief Operating Officer and Ms. Åsa Lamm as the new Chief People and Culture Officer starting in September. We are coming to the end of the three-year business plan. And we are working on the business plan for the next three years. And when it is concluded, we plan to present new and updated financial targets for the three years to come. Thank you for listening. We are now open for questions.
If you wish to ask a question, please dial pound key five on your telephone keypad to enter the queue. If you wish to withdraw your question, please dial pound key six on your telephone keypad. The next question comes from Laura Nardi from ABG Sundal Collier. Please go ahead.
Hi, Laura from Abuja. Just a couple of questions from my end. Firstly, I'd like to discuss the market environment. Would you say that market sentiment has changed or improved over the last quarter, given the potential rate cuts which could boost the attractiveness of your projects?
It's probably too early to tell, but we have seen an increase in CapEx prices and cost inflation over the last two years. On the other hand, interest rates are starting to go down. So yes, I would say that we see signs of increased activity and interest in the projects, though I cannot yet confirm that. We've seen it in investor valuations, but expect that trend to continue if the trend persists.
Thank you, very clear. Could you perhaps discuss the most recent pricing and cost trends? Are you confident that the project margins will remain at a healthy level?
Yes, for our best projects? Absolutely. Of course, we also have to prioritize within our portfolio and focus on the best projects. But we see prices for wind turbines now being stable for at least the last half year. And we have seen a significant reduction in costs for PV panels, and the prices affecting battery storage projects, like lithium, have come down significantly.
Thank you. Regarding your technology mix, how do you expect the mix to evolve going forward? You currently have a significant amount of offshore and onshore projects in your portfolio. Do you expect solar and storage to increase, or will we see a similar mix in the future?
Yes. Our main focus in the portfolio is onshore wind. Of course, when we add offshore projects, it has a huge impact on the size of the portfolio due to the size of each offshore project. When it comes to offshore, we see our position as earlier in the value chain compared to onshore and PV projects. So we would typically look to exit at the permit granted stage. Therefore, under current conditions, I don't foresee us starting any new offshore wind projects.
Thank you. And just one last question from my end. How is permitting developing? Are there any signs that lead times are changing for the better or for the worse? If you could discuss this, maybe for both your technologies, offshore and onshore, and how the trends are in the different countries you operate.
Great.
We always think lead times are too long compared to what they should be. They are really long in Sweden. They are shorter in Finland. In Poland, permit lead times are shorter, but lead times for grid connections are much longer. But I would say that the health benefits in this market also come from our long history and our large, diversified portfolio spread over both markets and technologies. So it's important for us to have a constant flow of projects that can compensate for long permitting lead times.
Okay. Thank you. That was all from my end.
Thanks, Laura.
The next question comes from Orjan Roden from Carnegie Investment Bank. Please go ahead.
Yes. Hi, everyone. Let's start with Centennial Flats. I suppose that is just affecting the cash flow here. Could you indicate roughly how much that is, or is it marginal? So there's no point in highlighting that specific part.
And the remaining milestone payments from Centennial Flats are really significant. We have a guide but I don't remember the exact figures for the interval; however, the lower end of the expected total revenues is well above 100 million USD, of which we have so far collected 40%. So, we have another 60% to collect. The exact timing of the milestones depends on our customer's decision to proceed with the project and make their final investment decision. But we have the milestones spread out from the notice to proceed to the commercial operation of the projects. So we expect to collect the remaining payments up until 2026.
Okay, thank you. Can you say anything about how the progression is going relative to the indicated range, or do you have any gut feeling about where in the range we might land at the end, or is it still entirely uncertain?
It's much related to the final design of the project. So it's very much up to the investor, what kind of revenue streams they will try to capture, and how tax equity will be sized for the project. So I'll have to pass on that question for now. But we'll definitely come back with an update in our reports as soon as we can narrow down the span.
Okay. Thank you. And you touch upon the market and the challenges your company is facing, and you look beyond just your own business. I can see that many other companies are struggling as well. What would you say is the key trigger? In order to generate renewed interest, is it down to electricity prices, a postcard from the ECB, or is it a combination of everything? What's your sense when you talk to customers? What are they waiting for in order to become more active?
It is, of course, a combination of interest rates and funding possibilities. These are of great importance for conducting transactions and also have a huge impact on valuation. Of course, clear political guidance also has an effect on many markets regarding where to invest. And all that, of course, has an impact on the long-term power price forecasts as well.
Okay, and just one question. The lease agreements you have removed from your net debt. How much is that roughly? Is it single digit, double digit, or triple digit?
Um.
You can help.
Sort out the amount.
Approximately 200 million SEK.
Okay.
So, almost ten SEK per share. So, it was not reasonable to include it in the calculation of net cash and net debt position.
And that is not treated as lease debt. According to IFRS 16. Is that correct? How should I interpret that? Because normally lease agreements are included.
But in the item on the balance sheet, we've just included a calculation for the net debt. That definition has been changed. And that's okay for us to have the definition.
Okay, I understand. Okay. Thank you very much. That was all from my side. Thank you.
As a reminder, if you wish to ask a question, please dial pound key five on your telephone keypad. There are no more phone questions at this time, so I hand the conference back to the speakers for any written questions and closing comments.
Okay, thanks for the questions and the comments. We have received some written questions in the chat. We'll try to answer some of them and for some more detailed questions, We'll try to get back to you with the answers in emails. The first question is about the project Tim Miller called 'burn in some external publications'. It's a small two-turbine project in Sweden, where the municipality retracted their positive support that they had given in 2014. They retracted after we had ordered the wind turbines for the project, there is an ongoing court case about it. We have appealed, and it's still in the portfolio. We're also running a parallel track to relocate the turbines to another project, worst case. But the project has therefore been quite postponed. Next question is about conditions for wind energy and the concern related to low prices during times of high wind and seasons. This is an expectation of what's called lower capture rates for technology that becomes dominant in the system. So, how we work with this and how investors deal with it is, of course, they have to make assumptions about the capture rate. That is the price that a specific project will receive compared to the average monthly electricity price in that price area. Investors have already been considering that for years. It is included in the long-term power price forecasts, for instance. So, what we can do is optimize project layouts. For instance, with longer blades that capture more wind during low wind times, we develop hybrid projects where we can include. For instance, a battery component or a solar PV component in the same grid connection. To make the combined project more valuable. Our project can also participate in the regulating power markets, especially for the down-regulating markets, to receive revenues even during hours with very low power prices. We can also make partnerships with consumers, including industrial consumers who are interested, of course, in buying electricity at low prices, for instance, for hydrogen production. The next question is: What is the most profitable energy storage in the US, or are standard onshore wind projects more profitable? And I would say that there are no standard projects. Every project is unique in terms of both technology and markets, so energy yield, CapEx costs, and operating costs differ significantly between technologies and markets. On average, if we were to consider all of Eolus's historical project margins and look at them from the quarterly reports, I guess we would end up seeing a number around roughly 15%. Of course, that must also be true for all new investments in the best projects or other technologies. Otherwise, if it's not at that level or better, we should not proceed. Um, next, the next question is about the EU Windpower Action Plan. If we see any meaningful benefits from that, and we do see a lot of the proposals and decisions from the EU as very favorable, but they need to really be implemented in the member states. That can really boost the industry, reduce the costs of both development and construction of projects, which would lead to lower power prices for both industry and consumers. The next question is about prices on battery storage and that the prices have fallen quite a lot during the recent year. And if it has any effect on, uh, on, uh, the pole in, uh, specifically, uh, no, it doesn't affect home. The price has been fixed for a year now. On the other hand, the PPA was signed at the same time. Prices are locked in both on the CapEx side. Uh, and also the operating revenues are.
Are, uh.
All logged in. Of course, it's a positive effect on all future battery storage projects. If battery prices stay at a lower level. Of course, the revenues from PPA tolling agreements will depend on the supply of the battery projects. That's also a question regarding the project we highlighted in the Q1 report, that we expected to close with the investor during the summer. That will now guide us, and we expect it to happen later. Uh, and, uh, it is a complicated project. It is a massive project of more than, uh, with the with the CapEx, around 200, uh, million U.S. dollars. Uh, um, several of the, uh, investors, uh, that had the highest, highest bids, uh, wanted us to secure, uh, both the construction financing for, for the project, um, and to construct, uh, the, uh, the, the, the project. So we we decided to to go, uh, that, uh, that route, um, since we, we think it, uh, It, uh, gives us a substantially higher value compared to the, uh, the, the risks compared to just selling it off as project rights and with the agreements. Um, there are also some, some questions regarding the share buyback program. Uh, that was approved by the annual general meeting during the, uh, the, uh, in, in, in May, uh, um, to, uh, to, uh, uh, make sure that it has, uh, the most efficient, uh, capital structure and, uh, currently, uh, there are, as you see in the, in the balance sheet. Uh, there's a lot of, uh, resources invested in, uh, in the projects. Um, and you see that from the net debt position? Um, so I would say that probably introduction of a, uh, or launching of the, uh, approved share buyback program. Uh, would probably require that that we sell the, the at least some of the, of the mentioned projects before it's, um, launched. And, and my final question is about the, the US election. Um, if it matters who becomes president in, uh, after the election in November? Uh, yeah. So, of course it can affect the market market situation. The Inflation Reduction Act is important for uh, um, for, for the projects and for uh, um, uh, uh, for, for, for the financing system. Uh, uh, Donald Trump had had some, uh, speeches, uh, against the system. But it's also we should also bear in mind that it is an agreement between the Democratic and the Republican Party and also, uh, that now a lot of the, uh, uh, American, uh, um, and enterprises are heavily relying on, uh, this, uh, way of financing, uh, project and, uh, the large, uh, American corporations. Uh, to, to to set off some, uh, uh, tax burdens. So our opinion is that it doesn't matter. Uh, that much, uh, it will be difficult to make radical changes in the, in the system. Um, and also, when it comes to legislation, there's very much, uh, legislation that is dependent on, on, uh, on state level, uh, uh, legislation and not so much on, on federal level. That was the the last question we received. So, uh, so thank you all for listening in today.
Thank you.