Hello everyone, and welcome to the NYAB results presentation for the third quarter of 2026. With us on this call, we have the Group CEO Johan Larsson and CFO Peter Franks. My name is Eric Peterson, and I am the VP of Corporate Affairs and Investor Relations at NYAB. Participants who wish to ask questions after the presentation are welcome to join the teleconference via the link in the invitation. You may also submit your questions in the chat, and you can find the chat under the presentation window on your screen. And now, to get started, I hand over to Johan who will go through the results. Thank you, Eric. Yes. Well, yet another strong quarter. Now we are in the second half, which contains our key quarters. Q3 started quite well. We have a strong revenue growth and a higher operating profit, and our operating margin is solid. Still room for improvement, but we're moving in the right direction. Civil engineering, as usual, drove the group revenue and earnings growth. We improved the operating margin in Sweden and in Finland. We had record high order intake, which is very necessary for the future to even out seasonality. We know that we will have a stronger H1. Great steps taken. Still, with a margin of 7%, we are achieving very strong growth. I am happy with that. And the record order intake makes it quite clear for everyone what we have seen and been talking about for some time, that there are heavy investments within the sectors we address, meaning energy, infrastructure, and industry. And our order intake more than doubled the order backlog year-on-year. Revenue-wise, we had strong growth. It is even more impressive in the numbers. For the first time, we have a quarter with revenues exceeding €190.2 million, which is an increase of 19% year over year. R12. Our operating profit. As you see, we have steady improvements. Now we are at 6.2% R12 with a goal of 7.5%. We are moving in the right direction. In the quarter, we grew the EBIT by 33% year over year. And as I mentioned, I rushed a bit at the start. Our order intake was a record high in the quarter at €555 million, where a bit more than half is our part of the Uppsala Tramway project. But we see heavy investment needs from defense, data centers, and infrastructure, covering both maintenance and new projects. R12. Our book-to-bill ratio is 107% year over year. And it amounts to more than 1,000 million euros. And our order backlog has more than doubled. We are a growth company and we have always had growth. We are accustomed to handling growth. We have tried to explain our business model where we have lower fixed costs, do less of the production ourselves, and we lead it. And that is what makes both sustainable margins and growth over time possible. Some more new projects to exemplify. You see what we have been talking about for some time? Our strength lies in being early in projects, participating in planning and designing our projects closely with our clients. In the quarter, we signed the Uppsala tramway phase two, which is of significant value. We are happy to continue our close collaboration with Svenska kraftnät. We signed the phase two order for Letsi-Svartbyn, where we were also involved at the early stage with a phase one to start the collaboration for this project. We have an early phase assignment for a steel coil logistics facility, an Early Works Agreement with SSAB, because in July we entered into part of SSAB's important and heavy long-term investments, building the next generation of steelmaking in Luleå. We can note that SSAB is a client of ours also in Finland and in other geographies. And when it comes to our long-term financial targets, these are of importance. And we try to be as clear as we are allowed to, with revenue growth exceeding 10% annually. The outcome R12 is 19%. And usually, we don't have any difficulties with reaching that target. Reaching that target profitability: more than 7.5% operating margin, or EBITDA. Here we have been quite clear to the market that you should not expect us to reach our. target in 2025 and 2026 due to the dilution from the Power Engineering business part of consulting. But we're still at 6.2%, hoping to improve it further in the last quarter. Next year is a new game for our capital structure, with net debt in relation to EBITDA of less than one and a half times. As you see, we have a negative net debt. A lot of room and flexibility is needed for a company like ours. We target a direct shareholder return in the form of a dividend that exceeds 35%. Nothing new. But. We had a dividend payout of 47%. And with that, I hand over to our CFO, Peter Franks. So congratulations to NYAB and the shareholders, Peter.
Thank you, Johan. I will now take you through the financial highlights of the third quarter. As Johan said, the key messages this quarter are strong revenue growth, higher operating profit, and the net cash position. I'll start with group revenue, profitability, and our financial position. Then I will move on to our two business segments, Civil Engineering and Consulting. So let's start with revenue. In the third quarter, group revenue was €190.2 million, up 27% on the same quarter last year. And that growth is all organic. Civil Engineering is the driver, with Civil Engineering revenue up 39%. However, consulting revenue was approximately €7 million lower. Two drivers sit behind the civil engineering revenue growth: higher production and a stronger starting point. The civil engineering order backlog coming into Q3 was 18% higher than a year earlier, at €502 million at the end of Q2 2026, against €425 million at the end of Q2 last year. Large infrastructure projects in Sweden. The ramp-up of the Mäntsälä data centre in Finland, and projects moving from planning into construction all contributed to the growth in revenue in Q3. That momentum is being carried forward. Group order intake was a record €555 million, of which Civil Engineering delivered €542 million. The civil engineering backlog has more than doubled year-on-year to €873.8 million, from €404 million in Q3 2025. Looking at the last 12 months, revenue grew 19% to €606.6 million. Of that, 14% was organic and 5% came from acquisitions. The R12 revenue split remained stable. Civil engineering is 84% of revenue, and consulting is 16%. By country, Sweden is 64%, Finland 21%, and Norway 12%. 58% of our revenue comes from the private sector and 42% from the public sector. The one shift is within sectors. Energy share of group revenue has fallen from 51% to 41%, while infrastructure share of group revenue has risen from 37% to 45%. That reflects project timing and our deliberate focus on infrastructure opportunities. Let's turn to profitability, where we delivered improved margins. Operating profit rose 33% year on year from €11.3 million to €15 million. The operating margin improved to 7.9% from 7.5%. Three things supported this. Firstly, the quarter's revenue growth. Secondly, continued solid profitability in the project portfolio. And thirdly, a revaluation gain on the total return swap connected to our long-term incentive plan. The increase in operating profit was driven by Civil Engineering, where operating profit grew 33%. The consulting segment had €1.1 million lower operating profit year on year. Together, these explain 2.3 million of the 3.8 million increase. The rest comes from group items, including the swap gain of about €1.7 million, which also helped improve the margin on a rolling 12-month basis. Operating profit increased 24% to €37.5 million with an operating margin of 6.2%. That reflects a healthy margin profile across the project portfolio. Net profit for the quarter was €12.6 million, up 49% from €8.5 million. Besides higher operating profit, we saw positive development in net financial items and in the share of results of associates and joint ventures. Now to our financial position, starting with free cash flow. Free cash flow for the quarter was -€6.2 million against €9.3 million a year ago. The main reason is timing, with a customer payment of €31 million arriving shortly after the quarter ended. Had it come in on time, free cash flow would have been around €25 million; on a rolling 12-month basis, free cash flow was €20.1 million, and the cash conversion rate was 45% of EBITDA. The cash conversion rate is below our historical levels due to the delayed receipt and the buildup of working capital in Q2 and Q3 for a strategic project with extended payment terms and compensating revenue adjustments. We foresee a significant reduction of working capital in Q4 in line with our invoicing and payment plans on that strategic project. We ended the quarter with a net cash position of €5.2 million, compared with net debt of €1.8 million a year ago. Net debt to EBITDA was -0.12 times against plus 0.05 times a year ago. That is less negative than the -0.3 times at the end of Q2 2026. Because of the cash flow timing I just described, we remain in a net cash position. Finally, return on capital employed on a rolling 12-month basis was 16.5% and the equity ratio was 64.8%. So let me now turn to our largest business segment, Civil Engineering, which represents 89% of our Q3 2026 revenue. I will cover order intake and backlog first. Then, revenue and profitability. In Civil Engineering, long-term investment programs in energy, infrastructure, and industry continue to support demand. Order intake reached a record €542 million. That is up €375 million from Q2 2026 and 433% higher than a year ago. The increase was driven by phase two orders for major collaborative projects. These include NYAB's share of phase two of the Uppsala tramway joint venture project, with a combined contract value of 6.5 billion Swedish krona. That is approximately €574 million. The order intake and backlog also includes phase two of the Letsi-Svartbyn 400kV transmission line in Norrbotten for 1.6 billion Swedish krona, or about €140 million. On top of that, as Johan Larsson indicated, we signed an Early Works Agreement with SSAB for the Kolsva Hotel in Luleå and added to the Mikkeli Data Centre project in Finland on a rolling 12-month basis. On a rolling 12-month basis, the book-to-bill ratio is 1.9 times. Order backlog grew to €873.8 million, up 116% year on year. Beyond the reported backlog, we have several early phase assignments covering planning, engineering, and design. These may progress into significant execution contracts at the end of the quarter. The estimated value of those potential contracts was approximately €200 million, compared with approximately €600 million at the end of the previous quarter. That change reflects new assignments, revised estimates, and assignments that moved into order intake and backlog during the quarter. With that, let me turn to Civil Engineering's revenue and profitability. Civil Engineering followed its expected seasonal pattern, with revenue increasing from Q2. Revenue rose 39% versus the same quarter last year to €169.5 million. That reflects the improved order intake and backlog and the ramp-up of production-intensive infrastructure projects during the summer. In Sweden, revenue increased 12% year on year. In Finland, it increased 126%, driven by high construction activity on the Mikkeli Data Centre project. Operating profit increased 33% to €13.7 million from €10.3 million. The operating margin contracted slightly to 8.1% from 8.4%. By country, the margin in Sweden improved from 7.8% to 8.4%. In Finland, it fell from 8.3% to 7.0%, reflecting the quarter's project mix with a greater contribution from renewable energy projects and continued investments in new hires to enable the future growth of Finland. On a rolling 12-month basis, revenue grew 19% and operating profit grew 21% at an operating margin of 7.3%. We now move to our consulting business segment, which represented 11% of the quarter's group revenue. I'll cover revenue and profitability first, then order intake and the outlook. Consulting had a weak quarter. Revenue decreased 25% to €21.1 million, and the operating margin was 0.6%, down from 4.5% year-on-year. Demand in the Norwegian offshore market stayed soft, and the number of consultants on assignments fell during the quarter. The appetite for new renewable energy investment projects also remained weak. The revenue decline is mainly due to lower demand for project personnel services in Norway's offshore market, and a more selective order intake; order intake fell to €13.4 million from €16.7 million in the same quarter last year. That brings the rolling 12-month book-to-bill ratio to 0.7 times revenue. On a rolling 12-month basis. Revenue was €100.2 million at an operating margin of 1.5%. Looking ahead, the cost, efficiency, and business transition measures we took earlier in 2026, particularly in Norway, have yet to take full effect. Meanwhile, the organization continues to build its presence in Sweden with an assignment for the early phase of a civil engineering project. That concludes the financial review of the third quarter. I'll now hand over to Johan for the summary and closing remarks.
Thank you, Peter. Great. Not much is surprising in the summary. We had strong revenue growth and a higher operating profit with a solid operating margin. As you saw, the result actually grew by 46% in the quarter. Civil engineering drove growth with increased revenue and earnings in both Sweden and Finland. And as Peter mentioned, worth highlighting is Finland's growth of 126% in the quarter. Still maintaining a quite decent margin of 7% despite that heavy growth and ramp-up costs. Costs and other factors. But what's important for shareholders to understand about this is historically, we have had quite weak results in Finland in H1 due to too low volumes. Meaning that the fixed costs have been a bit too high. And now we are taking steps in the right direction, knowing that the coming H1 starts with a much better position, and hopefully this will help Finland quite significantly improve their margins on a coming full-year basis. So, great performance there. And I am very happy with the Finnish performance and record order intake. We have ensured that we won't break this record in the coming Q3 due to the impossible comparison period, more or less. But of course, it is controlled. We know what we are doing. These are perennial contracts. We are looking forward to executing on this backlog. It is not just the volume of the backlog. It is the quality of the backlog that is satisfying and reassuring. Phase two orders were secured during the quarter. As I mentioned, when we looked at the projects already, it demonstrates the value of early customer involvement. And it also demonstrates the value of our consulting business. The solid financial position and focus on effective project execution and selective growth in these segments with attractive margins. So, the work continues steadily building a better and stronger company. Looking forward to finishing the year and looking forward even more to the coming year.
Thank you, Johan, and thank you, Peter. We will now open up the teleconference for questions.
If you wish to ask a question, please dial pound key five on your telephone keypad to enter the queue. If you wish to withdraw your question, please dial pound key six on your telephone keypad. The next question comes from Simon Johnson from ABG Sundal Collier. Please go ahead.
Hello, and congratulations on the strong numbers and thanks for taking my questions. I have a few. And first, I want to start with the margins. I think you clarified a few things. I just have a follow-up on Finland here. Wondering if you can clarify a bit more what you said about how much of the lower profitability now is due to ramp-up costs compared to lower profit margins in general. You sound a bit positive on margins in Finland for next year. So is it fair to assume that it's lower now due to ramp-up costs, or are there any changes in the margins?
It is fair to assume that, as Peter mentioned, there were also some old backlog works finalizing a few renewable projects that had tighter margins, but it is especially due to ramp-up costs. You can't go with 126% growth in a quarter without having costs ahead. It is part of the ongoing movement. And as a whole, I would say that with this growth, it is a strong margin to deliver 7% EBITDA. As I tried to state regarding the history of Finland, we have had certain challenges since we did a reverse takeover of a Finnish listed company. We have had too low volumes for being a public and listed company with the costs that are associated with it in H1. Finland has always performed quite well margin-wise and EBITDA-wise in H2. But this puts us in a position to make the coming full years a lot better.
I see. Thanks. Thanks for that. And just one follow-up on that. Regarding the projects you are finalizing, the more legacy-type projects, are those completed now or is it an ongoing finalization of those works?
Quite close to finalized after Q4. They are so finalized that you won't really trace them in the numbers as a whole. Understood.
I see, so some in Q4 as well, potentially, but then it will be a bit more clear in the next year.
The difference with Q4 is that you won't have the same ramp-up costs in Q4 that you had in Q3. So they are two different variables. One working for us, one working against us. If you are talking about short-term margins.
All right. Perfect. Then are you seeing similar ramp-up costs in Sweden still, or are you more satisfied with the margin levels you have in Sweden right now?
Yeah, we are satisfied, but there is still room for improvement. But it is project business. And in a quarter, you cannot take too much weight; you must see it over a bit longer time span. But to get back to your question, we still have ramp-up costs. As long as we have this growth rate that we have within Civil Engineering, you have costs.
That makes sense. And then on consulting and in that segment, it remains at the lower level. Are you seeing any change of pace or momentum into next year? Or given that orders are also low here, should we expect that margins in consulting remain low into next year as well?
I would say that just to give you some context, we have two different business models within consulting. One is project personnel, and one is consulting. Traditional consulting. The traditional consulting has a lot of synergies with Civil Engineering and NYAB. The project personnel is more of a broker business, low margin. The entity that we divested in North America was the PPE business. The segment that lost volume in Q3, a decline of 25%, all of it comes from the PPE business due to a decline in the offshore market. So, with that said, we are taking measures. The market works against us. Yet, of course, project personnel is not a key part of NYAB business as a whole.
So yeah. I believe that going into next year. We are already establishing our footprint in terms of consulting in Sweden, and we are starting to win projects within that part of our business. So there will be growth in the Swedish consultancy business. We are also comfortable with the growth of our consultancy business in Finland, and the consultancy business in Norway presents a good market opportunity for us that we are trying to capitalize on at this point in time.
Yeah. And what we can say is that we have been quite clear, mentioning to our shareholders and investors that we want to reach our EBITDA margin goal of 7.5% in 2025 and 2026 due to the dilution of margin from consulting and the PPE business. Our goal is to be as transparent as possible as we reach the end of this year. Regarding the outlook for 2027.
I see. Thanks for that. Then on the other side, you mentioned the early phase assignments of, I believe, 200 million or so. Is a large share of that attributable to the ongoing data center projects you are working on but haven't received the full orders for, or is this the projects that you haven't started yet? Are the ongoing data center projects that you are working on, but have not yet received the full orders for, included in that, or are these projects that you have not started yet?
It is other projects to a high extent, specifically for industry clients.
All right. Perfect. On the cash flow side, you clarified the weaker cash flow, mentioning timing, large payments, and so on. Is that the main reason, or are you also tying up some working capital in general due to the high growth?
Well, it is a natural part. Of course, as you grow, you tie up more working capital. So there is a piece of that. But of course, we also seek to get prepayments and timely payments as much as possible. But it is mainly as I indicated, we had 31 million come in a couple of days later than was due, which led to us having a negative free cash flow, but it would have been a very healthy, positive free cash flow if that had come in on time. And also, we have this strategic project that is taking up a level of working capital at this point in time, and we are working on the basis that it will be paid down during Q4. And so we will have a very healthy cash position at the end of this year.
Yeah. Yeah. And I would say that historically, we have been at cash conversion levels in the region of 90%. And we see that underlying, there is not much difference from that. It is more a matter of timing effects. Yeah.
All right. And a final one from me, a broader question. But as you subcontract most of the work, and now that we are seeing pretty strong demand for infrastructure in the Nordics, has your ability to sign subcontractors with good terms changed? Has that changed in any way or do you see it changing? Or can you elaborate a bit on your position there?
I would say that if you look at the infrastructure market as a whole and its growth, the market doesn't grow that much. The infrastructure market as a whole and its growth do not grow that much. Not to the extent that NYAB grows. So our model is quite intact. We are of course monitoring it closely, especially for niche segments and niche subcontractors to ensure that we have the capabilities needed. But I would help you with the question you should ask instead, given global concerns: how do we handle insecurity and possible increases in inputs such as energy prices and other costs? And related to that, I would say that there are more factors to consider. But since we have the position we have, we have clients that we can pass on some of the risks to, and our subcontractors can absorb a lot of the risks as well. But I would say that the focus is more there. We pay close attention going forward due to global uncertainties.
And maybe just.
Yeah, yeah. Sorry.
Yeah, just to.
I would like to supplement there as well; because we are doing the Early Works Agreement and we are doing the project planning piece, we are working closely with the subcontractor community to secure them to deliver our projects. So we know very clearly what the pricing and availability are before we sign contracts with our customers as well.
All right. And that was my follow-up. Are you seeing any impact on margins from higher material or labor costs?
Yes, we do not see an effect on the margin where we are now.
All right. Perfect. That is all for me, thank you.
Thank you.
Erik.
The next question comes from Christopher Gentle from Inderes. Please go ahead.
Hello. Johan and Peter. I have a couple of questions. I will take them one by one. So starting with the Civil Engineering margin. So, a follow-up on the previous question, but the margin fell to 8.1% from 8.4%. Despite the very strong growth. And you are increasing projects with higher margins. Could you start by giving some extra color on this year-on-year drop in the Civil Engineering margins?
Well, I would say that as you see Finland with 126% growth and you see quite a hefty growth in Sweden as well. I would say that those are the main reasons.
All right. Okay. And then, a bit broader question. So, on the works that you actually target, for instance. Trafikverket. Fingrid. Are you seeing more bidders than a year ago, and is pricing holding? And has your win rate on bids submitted changed in any way?
And now I would say that we see less competition to a vast volume of our potential revenue, since it is quite complicated to handle, and there are not that many competitors that have the planning, projecting, and early-phase capacity that we have. And in those kinds of projects, the competition is clearly lower. It is clearly less risk. And we get to an early phase where the client has the maximum use and value of us and we are rewarded for that. So, if you are talking about the general contractor business. Where we mainly do execution. I would say that it is pretty much the same. The competition there is pretty much the same.
All right. Got it. And then on cash flow, it seems like we should not read that much into this negative cash flow in Q3 due to the timing. But in general, does the shift toward larger and longer contracts lead to weaker advanced payment terms than your historical mix?
I wouldn't say that it's different from time to time, but with the existing business model and with the business that we have now, it's all about timing effects. We have just moved a great free cash flow start to Q4. So, that means we have a great start on the free cash flow in Q4. Instead of presenting it in Q3.
All right. Got it. And then if I recall correctly, in Q2, you mentioned that roughly 10% of the Meta data center contract was in the backlog. Could you give any update on what that share is now in Q3?
I know that it is clearly more, as we have received an order there, but I do not have the figure.
Yeah.
It's slightly higher than that, but it's more around the 15% to 20% mark.
Right. Thank you. And then the last one on this new agreement for the data center contract in Utajärvi. Could you give any indication of the value on that execution phase?
We cannot provide any guidance on the value of the agreement with the client.
Okay. All right. Thank you. That was all for me.
Thank you.
As a reminder, if you wish to ask a question, please dial the pound key on your telephone keypad. There are no more questions at this time. So I hand the conference back to the speakers for any written questions and closing comments.
Okay, great. Now let's move on to the questions in the chat. The first question. You have created a marine division. Can you tell us anything about that division and how it is developing?
Uh, yeah. Uh, great. Actually, we did an acquisition of a company a few years back that is now integrated into NYAB and renamed to NYAB Marine. It is a quite small business that we bought, and we have had very good progress there. It is seated mainly in the lowland area. They do work, of course, in larger geographies. However, the growth there is quite significant. I would say that it is approximately ten times the revenue that it was when we did the acquisition. It improves its margins, so that is a part of us. And one of the niches we are aiming for going forward. There will be a lot of water works, and the water market has an increasing demand.
Thank you. You have one. That question came from John here. The second question from the chat. It comes from Lucas. What would you say are the main aspects of your business model that people do not appreciate enough or have issues understanding?
Yeah. I would say that. It is a very traditional business and industry itself. We have been building and constructing both roads and buildings for quite some time. And the difference with us is that we have more focus on planning and designing in many forms. And we have a focus on project management leading the projects, meaning that we have to be very skilled with both contract law and construction law. The production itself is mostly carried out by subcontractors, meaning that less than 10% of our production is made by NYAB itself, although we own the production. And that means that we have a low fixed-cost business, low CapEx business, meaning that we are very flexible and we can scale it. And that is where our growth really comes from. It's the business model that allows this, and that is a bit difficult to understand because we operate as a hybrid between a traditional consulting company and an infrastructure company.
Thank you. Johan. And the last question is on share buybacks. Are these plans? And if so, what are you then going to do with them?
Uh, yeah. First of all, we need a mandate to buy back shares and we haven't gotten that mandate. To be formal. But it opens a lot of possibilities. The changes are now expected to take place on December 5th. And we will see how we handle them. We won't give them to key persons, of course, but in the context of a long-term incentive program related to very good performance, that could be part of their compensation.
Okay. Thank you very much. Johan, thank you for those answers. And the last question came from Johan. Hey, buddy. That is it for the Q&A. With that, we end that session. Next time we will meet will be when NYAB releases its year-end report of 2026. That is the 25th of February 2027. So for now, we thank everyone for participating and see you again next time. Thank.