Copyright © Inderes 2011 - present. All rights reserved.
  • Senaste
  • Börs
    • Aktiejämförelse
    • Börskalender
    • Utdelningskalender
    • Aktieanalys
    • Artiklar
  • InderesTV
  • Portfölj
  • Forum
  • Nora AI
  • Q&A
  • Om oss
    • Bolag under bevakning
    • Teamet
Pressmeddelande

Skanska conducts preparatory works for a new emergency hospital in Växjö, Sweden, for about SEK 1.2 billion

Skanska

Last spring, Skanska and the Kronoberg Region signed an agreement on a feasibility study for the new emergency hospital that will replace the existing hospital in Växjö. In total, there are approximately 135,000 square meters of new construction to be carried out and the project is divided into three phases; feasibility study (phase 0), design (phase 1) and production (phase 2).

The fact that Skanska has participated in the feasibility study has provided an opportunity to benefit from accumulated experience of hospital construction and make good use of it in the project at an early stage.

Work on phase one will begin in August with the goal of being able to begin phase two, production, in the autumn of 2023. The emergency hospital is expected to be completed in 2029.

Följ oss på våra kanaler i social media
  • Inderes Forum
  • Youtube
  • Instagram
  • Facebook
  • X (Twitter)
Ta kontakt
  • info@inderes.se
  • +46 8 411 43 80
  • Vattugatan 17, 5tr
    111 52 Stockholm
Inderes
  • Om oss
  • Teamet
  • Jobba hos oss
  • Inderes som en investering
  • Tjänster för börsbolag
Vår plattform
  • FAQ
  • Servicevillkor
  • Integritetspolicy
  • Disclaimer
Inderes disclaimer gällande utförda aktieanalyser kan läsas här. För mer detaljerad information över de aktier som aktivt bevakas av Inderes, vänligen se respektive bolags bolagsspecifika sida på Inderes webbplats. © Inderes Oyj. Alla rättigheter förbehållna.