Copyright © Inderes 2011 - present. All rights reserved.
  • Senaste
  • Börs
    • Aktiejämförelse
    • Börskalender
    • Utdelningskalender
    • Aktieanalys
    • Artiklar
  • inderesTV
  • Portfölj
  • Forum
  • Q&A
  • Om oss
    • Följda bolag
    • Teamet

Du verkar använda en bredare skärm. Vill du aktivera en bredare visningsupplevelse på denna sida?

MPC Energy Solutions – Presentation of Q1 2025 results

Av HC Andersen Capital
MPC Energy Solutions

MPC Energy Solutions expects to release its Q1 2025 results on April 30, 2025. Later that day, at 11:00 AM, the company’s CFO, Stefan Meichsner, will present the results and outlook for the rest of the year, and answer questions from the audience.

For the full year 2025, the company expects to deliver project revenue of between USD 12-13m (USD 12.8m in 2024) and Project EBITDA of USD 9-9.5m (USD 7.9m in 2024). The improvement is primarily driven by the San Patricio (Guatemala) project. Group EBITDA is expected to be between USD 6 and 7 million, reflecting additional cost reductions in 2025 related to overhead spending.

Besides how the financial results track compared to FY expectations, the focus will be on the focal points that the company has set out for 2025. With guidance dependent on the San Patricio projects, progress and keeping the timeline here will be important. News about the divestment of Colombian assets, to finalize the clean-up of the balance sheet, will draw some attention. Finally, comments about the potential return of cash to shareholders and progress in cost reductions will also draw attention.

MPC Energy Solutions (MPCES) develops, builds, owns, and operates renewable energy assets, including utility-scale solar photovoltaics (PV) and onshore wind farms, as well as combined-heat-and-power (CHP) installations, energy efficiency solutions, and hybrid projects, combining renewable sources and storage technologies. The projects are primarily situated in the Latin American and the Caribbean region.

Disclaimer: HC Andersen Capital receives payment from MPC Energy Solutions for a Corporate Visibility/Digital IR subscription agreement. /Michael Friis 14.27, 31-03-2025.

Recent videos

UPM and Sappi are planning a joint venture in graphic papers
2025-12-04 13:00 UPM-Kymmene
GreenMobility: How far away are driverless cars in Denmark
2025-12-04 11:32 GreenMobility
Systemair, Audiocast, Q2'25/26
2025-12-04 09:00 Systemair
Hafnia – Presentation of the quarterly report for Q3 2025
2025-12-02 11:00 Hafnia
Admicom Capital Markets Day 2025
2025-12-02 09:00 Admicom
Titta på alla videos
Följ oss på våra kanaler i social media
  • Inderes Forum
  • Youtube
  • Instagram
  • Facebook
  • X (Twitter)
Ta kontakt
  • info@inderes.se
  • +46 8 411 43 80
  • Vattugatan 17, 5tr
    111 52 Stockholm
Inderes
  • Om oss
  • Teamet
  • Jobba hos oss
  • Inderes som en investering
  • Tjänster för börsbolag
Vår plattform
  • FAQ
  • Servicevillkor
  • Integritetspolicy
  • Disclaimer
Inderes disclaimer gällande utförda aktieanalyser kan läsas här. För mer detaljerad information över de aktier som aktivt bevakas av Inderes, vänligen se respektive bolags bolagsspecifika sida på Inderes webbplats. © Inderes Oyj. Alla rättigheter förbehållna.